HGAM10KTA-MC Hurricane Tie Kit (Master Carton: 6 Kits)

Product Description

*For further description please see Simpson Strong-Tie Wood Construction Connectors Catalog.
**Click Load Table icon for size & fastening requirements.
H Seismic And Hurricane Ties / LTA2 Lateral Truss Anchor
for Masonry
Each Kit Contains:
10-HGAM10; 40-SDS1/4x1-1/2 screws and 40-TTN25234H (Titen masonary screws).
The Hurricane Tie series features various configurations of wind and seismic ties for trusses and rafters.
The H10S provides a high capacity connection from truss/rafter to wall. Also suitable for wood-to-wood applications.
The HM9 is designed to retrofit roof truss/rafters for block construction. The HM9 hurricane tie provides high uplift and lateral capacity using Simpson Strong-Tie® concrete fasteners.
The presloped 5/12 seat of the H16 provides for a tight fit and reduced deflection. The strap length provides for various truss heights up to a maximum of 13 1/2". Minimum heel height for H16 series is 4".
The new LTA2 is an embedded truss anchor for grouted CMU and concrete walls that develops high loads with shallow embedment. Designed for 2x4 minimum truss chords, the LTA2 resists uplift and lateral loads parallel and perpendicular to the wall with a minimum heel height requirement.
Features:
•Simplified design of the embedded portion allows for easy positioning close to rebar
• Ideal for anchoring trusses running perpendicular or parallel to the wall
•Embedment line stamped on part simplifies installation and helps avoid installation errors
Material: See table.
Finish: Galvanized; see Corrosion Information.
Installation:
•Use all specified fasteners. See General Notes.
H Ties:
•Connectors attached using hex head Simpson Strong-Tie® Titen® screws.
• Attach to grouted concrete block with a minimum one #5 rebar horizontal in the course.
• Hurricane Ties do not replace solid blocking.
LTA2:
•Whether in grouted CMU or concrete, the LTA2 must be embedded to the depth of the embedment line stamped on the part.
•A minimum of one horizontal #5 rebar is required at top of concrete or in the top course of grouted CMU.
•For parallel-to-wall applications, install the LTA2 with flanges facing the center of the wall. Minimum edge distance of 1 1/2" required.